Six Steps to Successful Systems Integration

Written By Alla Levin
April 17, 2021

Six Steps to Successful Systems Integration

Is the workflow in your company unsatisfying? Does productivity require a boost? If so, system integration (SI) is the best solution for achieving these goals. It refers to the connection of multiple subsystems into an extensive system for all components to function optimally.

Such symbiosis eliminates the necessity for manual data entry, reduces labor costs, saves time, and minimizes the risk of human error. SI consists of six essential steps, which have to be performed adequately for a satisfying outcome. Learn about each step in detail.

Determination of requirements

The first step towards successful system integration involves determining your requirements and sharing them with your system integrator. A list of requirements is necessary for the solution to address the needs of the customer. Employees need to consider the software convenient to use, so the outline has to include all business processes and operations the clients intend to improve.

Furthermore, there is no standard solution, as companies use different subsystems to complete their goals. Most importantly, the final product should be user-friendly and aimed at improving business performance. Follow this URL to learn twenty useful things about system integrators.

Conducting analysisuseful things about system integrators

Once the list of requirements is completed, the following step involves an analysis to assess the feasibility of the future software. During this phase, the job of IT specialists is to determine whether the proposed solution can address the concerns of clients.

The crucial thing for clients to remember in the analysis process is the readiness to make compromises. It’s usual for IT specialists to provide suggestions, such as adding extra features. The introduction of additional features is costly but essential for avoiding further costs. Unless you listen to the advice provided by system integrators, the chances are you’ll be investing in a completely new system when there’s a need for better functionality.

Architecture design

The next step toward successful system integration is dedicated to architecture design. The results of the analysis prove useful in the task of subsystem combination. Risk elimination can only be achieved by building a strong foundation. Integrators are supposed to come up with a plan for the successful integration of multiple components. These blueprints are of great importance for both parties, as they enable project visualization.

Moreover, integration plans should be detailed, showing how multiple systems will be integrated into a single one. The purpose of these blueprints is to enable data connectivity between components, boost productivity, and improve workflow. Once infrastructure design is created, a management plan should be devised.

The management team is of great value in the process of risk calculation and timeline creation. These specialists need to be sure the operations will continue running even when obstacles appear along the way. Make sure you check out this URL, https://www.thebalancesmb.com/how-to-calculate-business-risk-393472, to learn how to calculate business risk.

System integration design

The lengthiest and most complex stage of this procedure is the actual integration performance. This step could be conducted successfully only if the previous stages provided the necessary details. Integrators use the architecture design while integrating the subsystems, during which data loss shouldn’t occur.

The required time for integrators to complete this phase depends on the size and number of subsystems combined. Utmost precision is a must for data flow to be optimal. Unless the subsystems are integrated properly, your business processes won’t become automated.

System implementationSystem implementation

Once the most time-consuming phase comes to an end, the next step includes testing and verifying the system. When the software is subjected to testing, it’s unsurprising for software engineers to detect bugs. Upon bug detection, the task of engineers is to have them immediately fixed. Afterward, the product is subjected to another operational testing to ensure it’s flawless.

Additionally, if the product passes the operational test, it’s approved to go live. The importance of system integration testing shouldn’t be neglected to ensure smooth workflow. Such improvements can be noticed only if all employees are familiar with how the product works. Bear in mind that employees will most likely need some time to adjust to the changes.

Maintenance

The implementation phase isn’t the last one in the integration process. After the product is implemented, it should work flawlessly for employees to enjoy the benefits. Businesses will be happy to know the companies that design such systems are at their disposal whenever they need their assistance. Consequently, you can contact the company if you detect a bug or need to have a feature modified. IT specialists would be more than glad to take care of the issues.

Systems Integration: Final thoughts

SI is what every business needs to enhance workflow and productivity via systems integration. Hire the best integrators to handle the project!